Flagstone is sold by the ton and laid by the square foot, and the bridge between the two is thickness — a ton of one-inch stone covers 160 square feet and a ton of two-inch covers 80. You do not get to pick the thickness freely either: it is decided by whether the stone is bedded dry on a compacted base or mortared onto a concrete slab. That is the order the decisions actually happen in, and it is the order this works in.
Written and edited by Pablo Ruiz Quintero
Last reviewed 2026-09-21 · Nothing you type leaves your browser
How it is set decides everything else
Flagstone is sold by the ton and bought by the square foot, and the bridge between the two is thickness. A ton of one-inch stone covers twice what a ton of two-inch does — and you do not get to choose the thickness freely, because the setting method sets it.
The finished stone surface.
The other way.
Stone bedded on sand or stone dust over compacted base. It drains, it moves with the ground instead of cracking, and any piece can be lifted and reset. It needs thick stone, because each piece spans whatever void is under it.
Dry-laid on compacted base needs at least 1.5 in. Thicker stone means fewer square feet per ton.
The stone
The common and forgiving one. It splits into flat sheets naturally, it is soft enough to cut on site with a grinder, and it grips underfoot when wet. It also stains, and in a hard-freeze climate a soft sandstone will spall at the edges.
Broken edges fitted together like a puzzle. Cheapest stone by the ton and the most labour by a distance — a good irregular patio is somebody spending a day turning pieces around. Wide joints, which eat filler.
Irregular stone leaves joints about 1.5 in wide.
Dry-laid irregular stone is genuinely doable and genuinely slow — it is a puzzle with pieces that weigh forty pounds. Mortared work over a new slab is not a first project.
Used only to pick a regional labour rate. It stays in your browser.
2.8 tons, laid
$6,267
192 ft² · 80 ft² a ton · $33 a ft²
80 square feet a ton, at 2 in
Two thousand pounds divided by what a square foot of 2 in sandstone weighs. That single figure is the whole of the arithmetic, and it is why a price per square foot for flagstone means nothing on its own — at one inch this patio would take 1.4 tons instead of 2.8.
The same patio, set three ways
Each at the thinnest stone it allows, which is how it would actually be bought — yours at the thickness you picked.
| Set | Stone | Total |
|---|---|---|
| Dry-laid on compacted base · yours | 2 in | $6,267 |
| Mortared on a concrete slab | 1 in | $11,699 |
| Mortared on a slab you already have | 1 in | $8,099 |
Notice which way round it goes. Mortared work uses the cheapest stone on the list — and then needs a concrete slab under it, which is a separate trade and roughly the cost of the patio again. Mortaring onto concrete that is already there is the cheapest good answer there is, and it depends entirely on whether the concrete is sound.
Tons by thickness, on your patio
Same area, same stone, same cut — only the thickness changes.
What arrives on the drive
- Sandstone, irregular, 2 in
80 ft² a ton at this thickness, plus 15% for fitting. It arrives as 2 pallets.2.8 tons - Compacted base, 4 in
Crushed base rock under the whole patio. In a hard-freeze climate take it to six inches — the stone is not what heaves, the ground under it is.3.2 tons - Bedding, 1 in
Sand or stone dust to set each piece into and level it. This is the layer that does the fine adjustment, not the base.0.8 tons - Polymeric sand
Sand with a binder that sets when wetted. It locks the joints and keeps most weeds out, and it has to be swept in dry and watered exactly as the bag says — half-wetted polymeric sand hazes the stone permanently.$432
What it costs
National average. 2.8 tons of sandstone, dry-laid on compacted base, jointed and delivered. Not included: excavation and disposal of what is there now, and moving 5,600 lb of stone from where the lorry drops it to where it goes.
$33 a square foot all in, of which the stone itself is $856. The base and bedding are bulk aggregate, priced by the ton like everything else in the ground.
Worth knowing
- A ton of 2 in sandstone covers 80 ft², so this patio takes 2.8 tons — about 2 pallets. That coverage figure is the whole of the arithmetic, and it comes from the density: two thousand pounds divided by what a square foot of this thickness weighs. Change the thickness and the tonnage changes with it, which is why a price per square foot for flagstone is meaningless on its own.
- Irregular stone is the cheaper stone and the dearer patio. Every piece is turned, tried and trimmed, so the labour runs about 35 per cent above cut stone even though the material is a third less. Fifteen per cent goes to waste in the fitting, and that is the honest figure rather than the ten everybody quotes.
- Stone arrives on pallets of about a ton and three quarters, on a lorry with a forklift on the back. It goes where the forklift can reach and no further — moving it to the garden afterwards is wheelbarrows, and it is the part of the day nobody plans for. A 2.8 ton order is 2 pallets at roughly 1.8 tons each, and that is 5,520 lb arriving on your drive.
On this page — 5 sections
A ton covers whatever the thickness says
The short version
- Flagstone is sold by the ton and laid by the square foot. The bridge between them is thickness, and nothing can be ordered until it is settled.
- A ton of 1 in stone covers 160 ft². At 2 in it covers 80. Same ton, half the patio.
- You do not choose the thickness. Dry-laid needs 1.5 in or more; mortared on a slab can use 1 in.
- Mortared uses cheaper stone and costs more, because of the concrete slab underneath it.
Every flagstone price you will read is quoted per square foot, in a range so wide it is nearly useless — twenty dollars to seventy. The range is not caution about your particular garden. It is what happens when a number gets quoted in units the product is not sold in.
Flagstone is sold by the ton. It is laid by the square foot. And the conversion between those two is thickness, which almost nobody mentions.
| Thickness | Sandstone | Bluestone | Limestone | Quartzite |
|---|---|---|---|---|
| 1 in | 160 ft² | 145 ft² | 150 ft² | 145 ft² |
| 1.5 in | 107 ft² | 97 ft² | 100 ft² | 97 ft² |
| 2 in | 80 ft² | 73 ft² | 75 ft² | 73 ft² |
| 3 in | 53 ft² | 48 ft² | 50 ft² | 48 ft² |
Square feet a ton covers. It is two thousand pounds divided by what a square foot of that thickness weighs — so it is calculated from the density of the stone rather than copied from a chart, and denser stone covers less for the same money.
Read the first column and the third row together. The same ton of sandstone covers 160 square feet at an inch and 80 at two inches. On a 16 by 12 foot patio that is the difference between about a ton and a half of stone and nearly three tons — the same patio, the same stone, twice the money.
Which means the first question is never “how much does flagstone cost”. It is how is it being set, because that is what decides the thickness, and the thickness decides everything after it.
160 ft²
A ton at 1 in
Sandstone, mortared work
80 ft²
A ton at 2 in
The same ton, dry-laid
15%
Waste, irregular
Pieces trimmed to each other
1.8 t
A pallet
And it stops where the forklift stops
US Geological Survey, Physical properties of dimension stone — bulk density of sandstone, limestone, bluestone and quartzite · checked 2026-09-21
Dry-laid or mortared, and the slab nobody quotes
This is the decision, and it goes in a direction most people find surprising once it is laid out.
| Dry-laid on compacted base | Mortared on a concrete slab | |
|---|---|---|
| Stone thickness | 1.5–2 in | 1–1.5 in |
| Stone cost | Higher — you buy thickness | Lower — thin stone goes further |
| What goes underneath | 4 in base, 1 in bedding | A 4 in reinforced slab |
| Underneath costs | A few hundred in aggregate | About $12 a ft² — a second trade |
| Drainage | Straight through the joints | Runs off, needs a fall |
| When the ground moves | The patio moves with it | The slab cracks, and the stone follows |
| Repairable | Lift a piece and reset it | Chisel it out and re-bed it |
| Weeds | In the joints, always | Essentially none |
For most gardens, dry-laid is the right answer anyway, and not only on price. A dry-laid patio drains through its own joints, moves with ground that freezes and thaws instead of cracking, and can be taken apart and reset one stone at a time by anybody with a shovel. What it asks for in return is a properly compacted base — 4 inches, done in lifts, not a shovelful of sand raked flat — and thick enough stone that no piece is ever spanning a void on its own.
MaterialsEstimator, Flagstone price survey — by the ton, by the pallet and installed · checked 2026-09-21
Irregular is the cheap stone and the dear patio
The second decision runs the opposite way to how it looks on a price list, and it depends entirely on whose time is being spent.
Irregular stone keeps its natural broken edges. It is about a third cheaper by the ton, and laying it well is a puzzle: every piece is turned, tried against its neighbours, trimmed, and tried again. A good irregular patio is somebody spending a day on their knees arranging rocks. That is roughly 35 per cent more labour than cut stone, and it is 15 per cent waste rather than 8, because a piece that fits nowhere is waste however much of it is left.
Cut stone is sawn to rectangles and laid to a pattern. It costs about 50 per cent more a ton, it goes down quickly, the joints are tight and consistent, and the result reads as deliberate rather than rustic.
So: if you are paying somebody, cut stone is frequently the cheaper finished patio, because labour is the larger half. If you are laying it yourself and your own weekends are free, irregular is where the saving actually is.
| Stone | Irregular / ton | Cut / ton | What it is |
|---|---|---|---|
| Sandstone | $310 | $465 | The common and forgiving one. It splits into flat sheets naturally, it is soft enough to cut on site with a grinder, and it grips underfoot when wet. It also stains, and in a hard-freeze climate a soft sandstone will spall at the edges. |
| Bluestone | $440 | $704 | Dense, hard and consistent, which is why it is the default in the north-east and why it costs what it does. It survives freeze-thaw better than almost anything else here and it gets slippery when it is wet and smooth. |
| Limestone | $350 | $543 | Pale, even and easy to cut. It stays cooler underfoot than dark stone, which matters on a patio in the south, and it etches if anything acidic is spilled on it. |
| Quartzite | $520 | $832 | The hardest of these and the most slip-resistant. It is also the one that will not be cut with anything you own — every edge is a wet saw with a diamond blade, and that shows up in the labour rather than the material. |
| Granite | $470 | $776 | Effectively permanent and effectively uncuttable by hand. Usually chosen as cut pattern rather than irregular, because splitting it on site is not a thing that happens. |
One thing the price column does not show: how cuttable it is. Soft sandstone can be scored and snapped, or trimmed with an angle grinder and a chisel by somebody who has never done it before. Quartzite and granite need a wet saw with a diamond blade for every single edge. On an irregular patio, where nearly every piece gets trimmed, that difference is most of the labour — which is why the hard stones are usually bought cut to size in the first place.
Jointing, and matching it to the gap you will actually have
The joints are a third of what a flagstone patio looks like and most of what it costs to maintain, and the choice is constrained by something decided much earlier: how wide the joints are going to be. Irregular stone leaves about 1.5 inches. Cut stone leaves about 0.5.
| Filler | Joint width | What it does |
|---|---|---|
| Polymeric sand | 0.25–4 in | Sand with a binder that sets when wetted. It locks the joints and keeps most weeds out, and it has to be swept in dry and watered exactly as the bag says — half-wetted polymeric sand hazes the stone permanently. |
| Stone dust or coarse sand | 0.25–6 in | The traditional dry-laid filler. Cheap, it lets water through, it washes out of wide joints in heavy rain and it grows weeds. Easy to top up, which is the argument for it. |
| Mortar | 0.375–2 in | Only on mortared work over a slab. Mortar joints on a dry-laid patio crack the first winter, because the stones move and the mortar does not. |
| Planted — moss or thyme | 1–6 in | Soil in the joints with something low growing in it. It suits wide irregular joints, it needs the joints to be genuinely wide, and it is a garden rather than a floor. |
The things that are not in the stone price
- Excavation and disposal of whatever is there now — turf, old concrete, roots.
- Moving the stone from where the lorry drops it to where it goes. A modest patio is several tons by wheelbarrow.
- 4 in of compacted base and 1 in of bedding, or a concrete slab if it is being mortared.
- A plate compactor, which is a day's hire and is not optional on dry-laid work.
- An edge restraint or a soldier course, without which the outer stones creep outward over the years.
- Cutting, and whether the stone you chose can be cut with a grinder or needs a wet saw for every edge.
- Jointing material, which on wide irregular joints is a real quantity rather than a bag.
- Ordering the whole job in one delivery, because stone is a natural product and two pallets from different runs rarely match.
What goes wrong
01Ordering by the square foot without settling the thickness
A ton covers 160 ft² at an inch and 80 at two. Order a tonnage worked out on the wrong thickness and you are short by half, on a natural product where the next pallet will not match.
Instead — Settle the setting method, take the thickness from it, then convert area to tons through the coverage. The calculator above does it in that order because that is the order the decisions happen in.
02Laying thin stone dry
Bedded on sand, every piece bridges whatever small void ends up under it. Thin stone cracks across the middle the first time a point load lands on the wrong spot, and it cracks where nothing hides it.
Instead — 1.5 in minimum dry-laid and 2 in if the budget allows. Thin stone belongs on a slab, where the slab carries the load instead of the stone.
03Comparing mortared against dry-laid on the stone price alone
Mortared uses the thinner, cheaper stone — and then needs a reinforced slab at about $12 a square foot under it, which costs more than the stone does.
Instead — Compare the finished job. And check whether there is already sound concrete out there, because mortaring onto that is the cheapest good answer on the page.
04Choosing irregular stone to save money on a quoted job
It is a third cheaper by the ton and about 35 per cent more labour, and on a quoted job the labour is the bigger half. It also wastes 15 per cent instead of 8.
Instead — Choose irregular if you are laying it yourself, where the labour is free and the puzzle is the pleasant part. Choose cut if somebody is billing hours.
05Treating bedding sand as the base
The compacted base carries the load and the bedding only levels each stone into place. Deep sand instead of base gives a patio that looks perfect for one season and ruts in the second.
Instead — 4 in of crushed base compacted in lifts, then 1 in of bedding. Hire the plate compactor; raking it flat is not compacting it.
06Mortaring the joints of a dry-laid patio
The stones move with the ground — that is the entire point of dry-laying — and mortar does not move at all. The joints crack out in the first winter and then hold water in the cracks.
Instead — Sand, polymeric sand or planting on dry-laid work. Mortar joints only where the stone is mortared to a slab.
07Watering polymeric sand by eye
Too little and it never sets; too much and the binder floats onto the stone faces and dries as a permanent haze. There is no recovery from the second one on porous stone.
Instead — Sweep every grain off the faces first, follow the bag exactly, work in small sections, and pick a day with no rain due for twenty-four hours.
08Not planning where the pallets land
Stone arrives by forklift and goes where the forklift can reach, on hard level ground. Everything past that point is a wheelbarrow — and a modest patio is several tons.
Instead — Walk the route before ordering, and if the garden is only reachable through a house or a narrow gate, price in a day of labour for moving stone or a machine that can get there.
- 01Decide how it is being set firstDry on a compacted base, or mortared on a slab. Nothing else can be worked out until this is settled, because it is what fixes the thickness.
- 02Take the thickness from the methodDry-laid wants an inch and a half at the very least and two is better. Mortared over a slab can use one inch, because the slab carries the load rather than the stone.
- 03Work out the coverageTwo thousand pounds divided by what a square foot of that thickness weighs. It is the number that turns an area into a tonnage, and it halves when the thickness doubles.
- 04Add waste for the fittingEight per cent on cut stone, fifteen on irregular. Irregular is higher because pieces get trimmed to fit their neighbours rather than to a line.
- 05Price the base as well as the stoneDry-laid needs four inches of compacted base and an inch of bedding. Mortared needs a concrete slab, and that is a separate trade at roughly the cost of the patio again.
- 06Match the jointing to the jointWide irregular joints and narrow cut joints want different fillers, and using the wrong one means joints that either will not fill or will not hold.
- 07Work out where the pallets can landStone arrives by forklift and goes as far as the forklift reaches. Everything after that is a wheelbarrow, and it is the part of the day nobody plans for.
Dry-laid stone sits on 4 inches of compacted crushed base and an inch of bedding — bulk aggregate, priced by the ton. That page works out the tonnage with the compaction allowance already in it, which is the part people forget.
For the base underneath- Flagstone
- Stone that splits naturally into flat sheets — sandstone, bluestone, limestone, quartzite. It is sold by weight and laid by area, which is the whole reason estimating it is not obvious.
- Coverage
- Square feet a ton covers, and it is entirely a function of thickness. 160 ft² a ton at 1 in for sandstone, 80 at 2 in — the same ton, half the patio.
- Irregular
- Stone with its natural broken edges, fitted together like a puzzle with wide joints. The cheapest stone by the ton and the most labour to lay, by a distance.
- Pattern cut
- Stone sawn to rectangular sizes and laid to a repeating layout. More per ton, far quicker to lay, tight joints — and the only sensible way to buy the harder stones.
- Dry-laid
- Stone bedded on sand or stone dust over compacted base. It drains, it moves with the ground rather than cracking, and any piece can be lifted and reset. It needs thick stone.
- Mortared
- Stone set in mortar on a concrete slab. Rigid, sweepable and weed-free, and it is two jobs rather than one — because the slab has to exist first.
- Bedding course
- The 1 in of sand or stone dust the stone is set into and levelled in. It does the fine adjustment; the compacted base below it does the load carrying.
- Polymeric sand
- Jointing sand with a binder that sets when wetted. It locks the joints against washout and most weeds, and it hazes the stone permanently if it is watered wrong.
- Pallet
- How stone arrives — about 1.8 tons of it, on a lorry with a forklift on the back. It goes where the forklift reaches and no further.
- Spalling
- Flakes lifting off the face of a stone after freeze-thaw cycles. It is what a soft sandstone does in a northern winter, and it is why bluestone costs more where it gets cold.
- Control joint
- A deliberate weakened line in a concrete slab so it cracks where you chose. Under mortared stone it matters, because any crack in the slab eventually telegraphs through the stone above.
- Wet saw
- A diamond blade running in water, which is the only thing that cuts quartzite or granite cleanly. On soft sandstone a grinder and a chisel will do — and that difference lands in the labour rather than the material.
Common questions
- How much does a flagstone patio cost?
- Roughly $22 to $45 a square foot installed dry-laid, and $35 to $70 mortared — the gap is almost entirely the concrete slab the mortared version needs underneath it. Materials alone run about $8 to $20 a square foot. The reason every published range is this wide is that flagstone is sold by the ton and laid by the square foot, and the number of tons depends on a thickness that most estimates never mention.
- How many square feet does a ton of flagstone cover?
- It depends only on the thickness. A ton of 1 in sandstone covers about 160 ft²; at 2 in the same ton covers 80. The arithmetic is two thousand pounds divided by what a square foot of that thickness weighs, so denser stone covers less — a ton of 1 in bluestone is about 145 ft². This is the single figure that turns a patio into an order, and it is why you cannot buy flagstone sensibly without settling the thickness first.
- How thick should flagstone be?
- It is set by how it is laid, not by preference. Dry-laid on sand or stone dust, 1.5 in is the minimum and 2 in is the sensible answer, because each piece has to bridge whatever small void ends up beneath it — thin stone cracks across the middle the first time a chair leg lands wrong. Mortared onto a concrete slab, 1 in is fine, because the slab carries the load. That difference is also why dry-laid stone costs more in material: you are buying thickness you never see.
- Is it cheaper to dry-lay or mortar flagstone?
- Dry-laid, comfortably — but not for the reason people expect. Mortared work uses the thinner and therefore cheaper stone; what makes it expensive is that it needs a concrete slab underneath, at around $12 a square foot before any stone is bought. That is a separate trade and roughly the cost of the patio again. The exception is mortaring onto concrete that already exists and is sound, which is the cheapest good flagstone patio there is.
- Can I lay flagstone over an existing concrete patio?
- Yes, and it is often the best value on the page: thin stone, no excavation, no base, no compaction. The condition is that the concrete has to be sound. Check it for cracks wider than a credit card, for sections that have heaved relative to their neighbours, and for hollow-sounding spots. Any of those will telegraph through the stone within a few years, and stone bonded to failing concrete fails with it.
- Irregular or cut flagstone — which is cheaper?
- Irregular is the cheaper stone and the dearer patio. It costs about a third less by the ton and takes roughly 35 per cent more labour, because a good irregular patio is somebody spending a day turning pieces around and trimming them to each other. Cut stone is 50 per cent more by the ton and lays fast to a pattern. If you are paying somebody, cut is often the cheaper finished patio; if you are laying it yourself, irregular is where the saving is.
- What do I fill flagstone joints with?
- It depends on how wide the joints are. Irregular stone leaves joints around 1.5 in, which suits polymeric sand, stone dust or planting. Cut stone leaves about 0.5 in, which is too narrow to plant and fine for sand or mortar. Mortar joints belong only on mortared work over a slab — on a dry-laid patio the stones move and the mortar does not, so it cracks out the first winter.
- How much base goes under a flagstone patio?
- 4 in of compacted crushed base and 1 in of bedding sand or stone dust on top of it. In a hard-freeze climate take the base to six inches. It is worth being clear about which layer does what: the base carries the load and must be compacted in lifts, and the bedding is only there to level each stone into. Bedding sand laid deep instead of base is how a patio ends up rutted.
- What is the best stone for a patio?
- Bluestone where it freezes hard, because it survives freeze-thaw better than almost anything and it is dimensionally consistent. Sandstone anywhere milder, because it is cheaper, grips underfoot and can be cut on site with a grinder. Limestone stays cooler underfoot, which matters in the south. Quartzite is the most slip-resistant and the least cuttable — every edge is a wet saw, and that shows up in the labour.
- How is flagstone delivered?
- On pallets of about 1.8 tons each, on a lorry with a forklift on the back. The forklift will put the pallets on a hard, level surface it can reach — typically the drive. Everything after that is a wheelbarrow, and for a modest patio that is several tons of stone moved by hand. It is the single most underestimated part of a do-it-yourself flagstone job.
- Do I need to seal a flagstone patio?
- Not for the stone's sake, in most cases. Sealer is for stain resistance and for darkening the colour, and on a dense stone it does very little. On a porous sandstone it will reduce staining and it has to be redone every couple of years. What it will not do is stop weeds or hold joints together — that is what the jointing material is for.
- How much waste should I allow for flagstone?
- 8 per cent for cut stone and 15 for irregular. The usual advice of ten per cent is too low for irregular work, because pieces are trimmed to fit their neighbours rather than to a straight line, and a piece that will not fit anywhere is waste regardless of how much of it is left. Order the whole job at once, too: stone is a natural product and two pallets from different runs rarely match.
Send this to whoever is paying
The link carries your measurements, so whoever opens it sees the same numbers you are looking at — and you can come back to it yourself tomorrow with the delivery note in front of you.
Plain links, no tracking scripts. Nothing here reports back that you shared it.

About the author
Pablo Ruiz Quintero — Editor
Editor of MaterialsEstimator. Decides which documents count as a source, what every default value is, and where the line sits between what the reader parses and what the engines compute.
More about how this site is edited