Skip to content
MaterialsEstimator
Every tool

Groundwork and paving

Everything that gets poured, compacted or laid on the ground

Floors

Inside, from the subfloor up

Walls and ceilings

Board, paint and what goes behind them

Roof and exterior

The outside of the building and the water coming off it

Outdoor structures and landscape

Decks, fences and everything green

Sizing the systems

Heating, cooling and hot water

Framing and carpentry

Cut lists, layout and the code that constrains them

Measuring and costing

The tools that feed every other one

Appearance

How this is worked out

Trust

Data changelog

A site of numbers that edits itself in silence is not checkable. Every figure here has a date and a reason, from the day it was first published.

Maintained by Pablo Ruiz Quintero · Last reviewed 2026-09-16

2026-09-16

Method change

Aggregate waste no longer includes compaction

The aggregate allowance used to be a flat 10% that was really the material settling. Now every aggregate carries its own compaction figure — 20% for base rock with fines, 8% for clean stone — applied to the finished volume before waste, and the waste allowance covers only real waste: the unfinished edge, what stays in the barrow, ungraded ground. Keeping both at 10% would have counted the same thing twice and over-ordered.

Read from MaterialsEstimator, Aggregate depth and compaction practice survey

New data

Aggregate bulk density

Published pounds per cubic yard as a low-to-high range for seven materials, rather than the single figure the rest of the market quotes. The tonnage a job needs is reported as a range for the same reason: a yard of sand weighs 2,600 lb dry and 3,000 lb wet, and that spread is the customer's to see.

Read from ASTM International, ASTM C29/C29M, Standard Test Method for Bulk Density (Unit Weight) and Voids in Aggregate and MaterialsEstimator, Aggregate bulk density survey

New data

Delivered aggregate price, minimum load and haul fee

Published price per ton by material, the one-ton delivery minimum and the flat haul fee of roughly $60–125 per load — built into the quoted price rather than left as a footnote, because on a small order the truck costs more than the stone.

Read from MaterialsEstimator, Delivered aggregate price survey

Method change

How sources are recorded

Every figure now references a source entry by id rather than carrying its attribution as loose text. The sources page is generated from those entries, so a citation on a calculator and the entry on this site cannot drift apart. No figure changed.

2026-09-15

New data

Delivered ready-mix price

Published a national delivered range of $140–200 per cubic yard, typical $165, carrying a high freight sensitivity because haul distance moves this price far more than the state line does.

Read from MaterialsEstimator, Delivered ready-mix price survey

What goes here and what goes in corrections

This log records figures that are new, revised, re-verified or computed a different way — the ordinary life of a dataset. A number that was wrong when it was published goes in corrections instead, with what it said and how far off it was.

“Re-verified, unchanged” is an entry on purpose. Knowing a price was checked last month and did not move is worth as much as knowing it moved.